...
Production rate factor can be used to indicate if more or less time than standard required (ie faster machine)
Overhead rate is used to calculate overhead loading on all tasks and is added to the person at the work centre overhead rate
The WIP bay is used if materials are issued from stock then fabricated items are returned at the end of the station
...
Manufacturing station types setup
...
Trigger to create a Build
...
Driver will update Portal with drops and in situation photos
Manufacturing setups
Manufacturing Stations
Production work orders pass through manufacturing stations
...
Special types can trigger other system processes > like label printing etc
Production rate factors are used if some are faster than others for the same production process
Location is used if raw materials are issued to a job at the start of the job to hold the material in WIP until completion
Manufacturing station Types setup
...
Manufacturing Processes - configurable Job
Manufacturing processes involve
Production Centres
Production Steps
Expected times
A Product Category that components may come from
Tag (used to include or exclude based on component choices)
...
SKU BOM settings
Manufacturing Flag
When the SKU has manufacturing flag ON the product will default to manufacturing
...
Manufacturing Process link
Link to the manufacturing process from the manufacturing tab
...
SKU component TAG
The TAG is used to include or exclude manufacturing process steps in a Job
...