Table of Contents |
---|
...
When linked to individual SKU’s the Manufacturing Process Template can be scaled up or down from standard times.
Example
Manufacturing Process “Sofa” Linked to
2 Seater - has scaling factor of x1
3 seater - has a scaling factor of x 1.75
The result is less process are required to be defined
...
Tags on a Manufacturing Step are Matched with TAGS on a SKU to modify the Build Process Created
Example
Manufacturing Process Step Mode (include) with a TAG (A)
SKUS with a TAG of (A) will include this step when the build is created
Manufacturing Process Step Mode (exclude) with a TAG (B)
SKUS with a TAG of (B) will exclude this step when the build is created
SKUS with a TAG of (AB) will include the TAG (a) step AND exclude the TAG (B ) Step when a build is created
The result is that less processes are required to be defined
...
a copy of the Manufacturing Process is made for each item to be built
Example order 2x 2 seater will result in 2 build processes (one each)
Build Processes are attached to the ordered item
Build Processes can be modified as required for each items unique design requirements
...
Where the sequence is the same - steps may happen in parallel
Where the sequence number is greater - the step must wait for previous sequences to be completed
Example - multiple steps (Seq 2) may commence after the first step complete AND Uphosltery and Fabric cutting are revisited
Build Process: Seq - (Station): Step
Seq 1 - (Woodwork) Make Frame
Seq 2 - (Woodwork) Fit legs
Seq 2 - (Fabric Cutting and sewing) Make slip cover
Seq 3 - (Upholstery) Cover frame with foam
Seq 4 - (Fabric Cutting and Sewing) cut Fitted fabric
Seq 5 - (Upholstery) Fit Fitted Fabric
Manufacturing Stations
Stations are where people work and complete build steps
...
Each center has multiple Areas
Each Area may have multiple workstations
Example:
Manufacturing Venue may is at Street Address XYZ
This is used on supplier purchase orders to indicate delivery address
This venue has the following Areas
Woodwork
Material Cutting
Upholstery
Fit Finish and QA
Stations are within areas
Example - the Woodwork Area may have 3 stations
Rosters are linked to venues and the created roster shifts are visible and can be modified from here
...
Tags - indicate if process steps are included or excluded.
Tags are individual letters - can have multiple Tags
...
...
A build is the process steps for an individual ordered item
Builds are created manually once the sourcing planner is confident the materials are or will be available in time
Create from the Sales Order
Create build for this item creates the build steps
Copy from the build process and apply multiplier and tags
Build steps can be individually modified to improve planning
ie additional time may be required to do different seaming based on design etc.
It is common for
An order to have more than one item - it will have one build per item
eg order with 2x 2 seater And 1x 3 seater = 3 builds (one per item being built)
Manufacturing of all the items on one order flow through together
Build Planner view
The build planner
Creates build steps once materials available and ready to plan
Modifies the build steps if required (example modifications to standard design)
Manages priority (order ExWarehouse date)
Build steps have expected time in a station.
To check capacity vs the expected time will require rosters to be completed
...
Modifying Build Steps for an individual item
Can modify all details name, sequence, station, materials and estimated time for individual build steps
...
Staff Rosters
Capacity across workcenters requires rosters
Rosters are easily created from a pattern for n weeks in advance - and can be adjusted anytime (shifts added / people changed)
Roster Patterns
Roster patterns are used to create shifts (and hence capacity) - think of them as a template
They have links to Rooms, Persons and Stations and hours and breaks
Small manufacturing centres may have a single roster patter for the week
Larger organisations may have patterns for each area (eg paint booth) or skill (eg Electrician)
Stations are mandatory for Production Rosters
Example Roster Pattern
...
Example Roster Pattern filtered for an individual
...
Preview of example roster pattern
...
Roster Shifts
Rosters are work shifts
Rosters can be created manually or from a roster pattern
When creating a Roster from a Roster Pattern
Will skip existing shifts
Example
roster pattern has nobody on Monday - but a person is now hired for Monday > so the roster pattern is adjusted
Rosters were already created some time ago
Using the roster pattern to create rosters will only add the Monday shift (it skips where the shift already exists
Can skip weeks
Example
every second week we work the weekend
create a roster pattern for the weekend work only
then when creating the roster by enter the # weeks to skip (every 1 week)
Example using a roster pattern to create 4 weeks of work (skipping 1 week between weeks)
Results in
...
View and edit the Roster shifts once created from the venue
From a view of the Roster can:
edit
delete
clear to create new shifts
...
Staff Rosters
Capacity across workcenters requires rosters
Rosters are easily created from a pattern for n weeks in advance - and can be adjusted anytime (shifts added / people changed)
Roster Patterns
Roster patterns are used to create shifts (and hence capacity) - think of them as a template
They have links to Rooms, Persons and Stations and hours and breaks
Small manufacturing centres may have a single roster patter for the week
Larger organisations may have patterns for each area (eg paint booth) or skill (eg Electrician)
Stations are mandatory for Production Rosters
Example Roster Pattern
...
Example Roster Pattern filtered for an individual
...
Preview of example roster pattern
...
Roster Shifts
Rosters are work shifts
Rosters can be created manually or from a roster pattern
When creating a Roster from a Roster Pattern
Will skip existing shifts
Example
roster pattern has nobody on Monday - but a person is now hired for Monday > so the roster pattern is adjusted
Rosters were already created some time ago
Using the roster pattern to create rosters will only add the Monday shift (it skips where the shift already exists
Can skip weeks
Example
every second week we work the weekend
create a roster pattern for the weekend work only
then when creating the roster by enter the # weeks to skip (every 1 week)
Example using a roster pattern to create 4 weeks of work (skipping 1 week between weeks)
Results in
...
View and edit the Roster shifts once created from the venue
From a view of the Roster can:
edit
delete
clear to create new shifts
...
Build Planner
A build is the process steps for an individual ordered item
Builds are created manually once the sourcing planner is confident the materials are or will be available in time
Create from the Sales Order
Create build for this item creates the build steps
Copy from the build process and apply multiplier and tags
Build steps can be individually modified to improve planning
ie additional time may be required to do different seaming based on design etc.
It is common for
An order to have more than one item - it will have one build per item
eg order with 2x 2 seater And 1x 3 seater = 3 builds (one per item being built)
Manufacturing of all the items on one order flow through together
Creating and managing Builds
The build planner
Creates build steps once materials available and ready to plan
Modifies the build steps if required (example modifications to standard design)
Manages priority (order ExWarehouse date)
Build steps have expected time in a station.
To check capacity vs the expected time will require rosters to be completed
...
Modifying Build Steps for an individual item
Can modify all details name, sequence, station, materials and estimated time for individual build steps
...
Creating Builds on the Production Plan Tab
First confirm you have viewed the drawings are ok to manufacture (audit tracked)
...
Then create the build
...
Capacity Planning
Capacity from Rostered shifts
Time in Stations each day
Working forward from today
Required work from Build Steps
Hours required in Stations
Working backwards through build steps from ExWarehouse Date
Due dates for each order
Each order has an exWarehouse Date
Changing the exWarehouse date changes the required work dates for each of the build steps
The Capacity planner has two numbers for each workstation each day
The total number of hours of work required to be completed by that day
The total number of hours of capacity left after work completed
Workstations taking work
Stations have a pile of build steps to complete
...